Outros resultados
This decision could be attributed to the resource constraints of UNOPS, whereby variable overheads needed to be reduced to ensure that UNOPS had a surplus to contribute to its operational reserve.
做出这项决定可能是由于项目厅资源拮据造成的,因为需要减少各种间接费用,确保项目厅有余额维持业务储备资金。
Variable costs comprise prime costs and variable manufacturing overhead.
变动成本包括主要成本和制造费用中的变动部分。
Generally, direct costs are variable, while manufacturing overhead may be either fixed or variable.
一般说来,直接成本属于变动成本,制造费用既可以是固定成本也可以是变动成本。
Both variable and fixed manufacturing overhead.
变动及固定制造费用。
The resulting variable costs attributable to co-financing resources represent the contributions of each division to overall overhead.
因此而得出的与共同供资资源有关的可变费用代表每个司在总营运费中所涉的部分。
And in-depth labour, overhead, and fixed and variable expense allocation gives you maximum cost management and control.
深入的劳动力、间接成本,以及固定或可变费用分配可实现最大化成本管理和控制。
Where manufacture of the goods was partially completed, compensation is recommended for all costs actually incurred, which may include "variable costs" plus reasonable overhead costs.
59 对于部分完成货物制造过程的情况,建议赔偿实际发生的所有费用,其中可包括" 可变费用" 再加上合理的管理费用。
These costs include 'variable costs' plus reasonable overhead costs, less credit for any proceeds of resale and costs saved".
这些费用可包括'可变成本`,加上合理的间接成本,减去转售和节约的费用方面的收益款项。"
Cost of sales is comprised of material costs, a variable expense, and other manufacturing costs, comprised of both fixed and variable expenses, including direct and indirect labor, outbound freight, and overhead expenses.
销售成本由材料成本、可变费用和其它制造成本组成,包括固定和可变费用、包括直接和间接劳动、出站货运和间接费用。
The following can be edited as long as the completion confirmations have not yet posted: Fixed and variable machine hourly rates, personnel hourly rates, overhead rates and special costs.
只要完成确认尚未发布,就可以编辑以下内容:固定和变动机器每小时费率,人员每小时费率,间接费率和特殊费用。
Valvetrain Chain driven dual overhead cams, 4 valves per cylinder with variable intake valve timing (VVT)
气门 链传动双顶置凸轮轴,每缸4个气门,采用可变气门正时技术(VVT)
Where manufacture of the goods was partially completed prior to the interruption, the Panel has recommended compensation for all costs actually incurred, which may include "variable costs" plus reasonable overhead costs.
对于货物制造过程在合同中断之前已经完成的情况,小组建议赔偿合同价减去由于未能完成原合同而没有发生的任何费用;64 对于货物制造过程在合同中断之前部分完成的情况,小组建议赔偿实际发生的所有费用,其中可包括" 可变费用" 再加上合理的间接费用。
A variable speed motor 16 controls the operation of the pump 15 to regulate the vacuum within the eductor 18 and thereby regulate the rate at which the overhead gas from space 20 is withdrawn through the suction tube 19, mixed with the recirculating liquid in the eductor 18 and ejected into the suction end of the impeller 6.
为了调节喷射器18内的真空度,进而借以调节通过吸气管19从空间20中抽取上部气体的速率、在喷射器18中与再循环液的混合以及被喷射到叶轮6负压端的速率,使用变速马达16控制泵15的操作。