Code for construction and acceptance of chemical machinery installation (opposed compressors)
化工机器安装工程施工及验收规范 (对置式压缩机)
The procedure and eligibility criteria for the heat exchanger shall be in accordance with the provisions of "Code for construction and acceptance of heat exchange equipment in petrochemical industry".
换热器试压的程序和合格标准应符合《石油化工换热设备施工及验收规范》的规定。
Code for construction and acceptance of chemical tower-type equipment
化工塔类设备施工及验收规范
The interior door is of timber door, please refer to its making method chart of wooden door for details. The timber selects grade 1 material, during timber processing, the degreasing steaming and boiling treatment shall be performed so as to make its moisture content shall not exceed the requirement of Code for construction quality acceptance of timber structures; the timber shall not be deformed nor cracked. All timber shall be of termite proof treatment, for detailed method please contact the local termite proof treatment authority.
Wiring of fire alarm system shall comply with the provisions of the current national standard Code for Construction and Acceptance of Electric Device.
火灾自动报警系统的布线,应符合现行国家标准《电气装置工程施工及验收规范》的规定。
Wooden joist, skids, and subfloor, etc under wood and bamboo floor should adopt timber. Its moisture content as well as waterproof, anti-corrosion, moth treatment should comply with the relevant provisions of existing national standards, Code for Construction Quality Acceptance of Timber Structures (GB50206).
2.2 The selected standard of the wood floor and the limit moisture content should meet the requirement of Code for Construction and Acceptance of Timber Structures GBJ206-83.
2.2 Selection standard of wooden floor and moisure content limits when laying wooden floor shall be implemented in accordance with Code for Construction and Acceptance of Timber Structures (GBJ206-83).
Execute Code for Construction and Acceptance of Boiler Installation Engineering GB50273 in boiler installation and inspection.
锅炉安装及验收执行GB50273《锅炉安装工程施工及验收规范》。
Construction drawings, and standard & code for construction and acceptance should be ready and meet construction requirements.
施工图纸,施工及验收标准规范等已准备就绪,满足施工要求。
According to «Code for Design of Timer Structures» and «Code for Construction Quality Acceptance of Timber Structures», hire experienced project manager and skilled workers to assemble the house.
Organize relevant personnel to be familiar with the TSG G0001 Boiler Safety Technology Supervisory Regulations, boiler drawings, installation manual, operation manual, GB50273 Code for Construction and Acceptance of Boiler Installation Engineering and Construction Organization Design, etc.
Code for Construction and Acceptance of Electric-lighting Device of Electrical Equipment Installation Project GB50259-96
GB50259-96 电气装置安装工程电气照明装置施工及验收规范
Conținut posibil inadecvat
Exemplele au rolul de a te ajuta să traduci cuvinte sau expresii corect si adaptat la context. Nu sunt selectate sau validate manual, așadar pot conține termeni inadecvați. Te rugăm să raportezi exemplele pe care le consideri inadecvate. Traducerile vulgare sau colocviale sunt în general marcate cu roșu sau cu portocaliu.