The concept of constructibility as discussed in this article applies specifically to compass and straightedge construction.
应该强调的是本文中讨论的作图专指尺规作图 。
Abstract algebra was developed in the 19th century, deriving from the interest in solving equations, initially focusing on what is now called Galois theory, and on constructibility issues.
抽象代數的發展始於19世紀,一開始專注在今日稱為伽羅瓦理論及規矩數的問題上。
Many Beam-Arch Combination System Bridges, as their good mechanical behavior, low cost, constructibility and beautiful appearance, have been built all over China in these years.
梁拱组合体系桥梁近年来在我国发展迅速,由于其受力合理、造价低廉、施工简便、造型美观等特点,在公路建设中得到广泛应用。
Alte rezultate
It had taken about six months for revision of the scope of work, cost estimation, constructability review and finalization of specifications.
修订工作范围、估计费用、进行可建设性审查及最终敲定技术规格共用了六个月时间。
The Ministry of Public Works is in charge of design verification, structural evaluation, and constructability.
智利公共工程部负责设计验证、结构评估和可施工性分析。
Serious consideration is given in the design stage to ensure rapid and accurate constructability.
设计阶段的周详考虑确保了快速、准确的高炉建造。
During this stage, design documents are reviewed for constructability and cost-saving opportunities.
在这一阶段,对设计文件加以审查,以确定可施工性和节约成本的机会。
ensure more effective "engineering readiness" through the application of advanced work packaging to improve constructability; and
确保通过应用高级工作打包实现更有效的"工程就绪性 ", 以改进可施工性;
Another distinct advantage is that designs can be reviewed with regard to their constructability as the project progresses through various stages of planning and design.
另一项明显的优势是,随着项目进展到规划和设计的不同阶段,可以检查设计是否适用于施工。
However, OIOS observed that only a limited constructability review of the specifications document and drawings had been performed by the Office.
然而,监督厅指出,该办公室仅仅对规格文件和图纸进行了有限的可施工性审查。
Breakdown of structured staging plan (need to identify external factors, constructability assessment and sales absorption rates).
结构化分阶段计划分解(需要确定外部因素、施工能力评价、销售吸收率)。
Check RAM designs at any time against rules created by your firm to meet constructability, safety, and schedule requirements.
根据贵公司制定的规则于任意时间检查RAM设计,以满足施工、安全和进度要求。
Concerns about constructability for resilience to blast threats emanating outside the complex resulted in the suspension of design work on both buildings, pending resolution of the security issue.
由于对是否可构建一种能力以抵御来自建筑群以外的爆炸威胁存在关切,导致两座大楼的设计工作暂停,等待安保问题得到解决。