This requires the crane load test after installation only after the transfer of use.
这就要求在起重机安装后进行负荷试验后才可移交使用。
And can also be used in the load test
4 replacement of new spare parts must be run and load test after the formal use.
Each device is required to receive a load test for 72 consecutive hours before shipped.
Type the maximum number of error details to track for this load test.
The average duration of tests executed in a load test.
The total number of validation rule errors in a load test.
负载测试中验证规则错误的总数。
Configuring load test may take few minutes...
正在配置负载测试数据库。这可能需要几分钟...
Contacting controller to access the load test result store...
正在与控制器联系以访问负载测试结果存储库...
There are no tests in this load test.
此负载测试中没有测试。
Failed to clear load test database configuration.
未能清除负载测试数据库配置。
Loading test run information from the load test results store...
正在从负载测试结果存储库中加载测试运行信息...
The total number log entries of a particular type written during a load test.
负载测试期间写入的特定类型的总日志条目数。