Boxon engineers standardize the packaging based on the size of containers and trucks, which increases the loading rate of containers and trucks, thus saving transportation costs.
博壳松根据集装箱、货车等的尺寸来对包装标准化设计,提高集装箱和货车等的装载率,从而节省运输费用。
The use of double-deck vehicle can increase the loading rate by 40%, transportation with pallets can improve the vehicle{\cs12\fs9\cf1\b\f47 circulating availability and reduce the handling process.
双车辆可提高40%的装载率,带托运输可提高车辆周转率,减少装卸环节;
Furthermore, fill time and organic loading rate were conditioned each other.
而且,充水时间和负荷率相互之间也存在着制约关系。
Identify the type, loading rate and serial number of the hoisting equipment
确认吊装设备的类型,承载率和序列号。
Customized vehicles increase the loading rate of transportation of finished goods
定制化车辆提高成品运输的装车率
In many open-loop machines, there is single-valued relationship between loading rate and stiffness during dynamic testing.
许多开路机器在动态试验时,加载速度和刚度之间只有单值关系。
Maximum achievable loading rate remains at approximately 88,000 barrels per hour.
可以达到的最快装船速度仍然是每小时大约8.8万桶。
Current solution will not deliver assumed loading rate in capacity calculation, because there is no opportunity to smooth the variability of coal flow from the reclaimer, due to reclaiming the ends of the pile and different benches.
当前的解决方案未在容量计算中提供假设的装货速率,因为没有机会消除桩和不同工作台两端恢复所造成的取料机煤流的变化。
be so arranged as to prevent the design pressure of any cargo tank being exceeded. For the purposes of this regulation the system shall be designed on the basis of the maximum designed cargo loading rate of any tank or group of tanks multiplied by a factor at least 1.25.
(e) 其布置须防止超逾任何液货舱的设计压力。就本条而言,该系统须以任何液货舱或任何一组液货舱的最高设计货物装载速率乘以至少为1.25的因子,作为设计的依据。
"(11) The master shall be provided with information regarding the maximum permissible loading rate for each cargo tank and, in the case of combined venting systems, for each group of cargo tanks."
(11) 船长须获提供有关每个液货舱最大容许装载速率的数据,此外,如属合并排气系统,则须获提供每组液货舱的最大容许装载速率的数据。
The results show that the fracture toughness of Kic increased with lower loading rate and higher test temperature and the incision depth has no significant impact on the test results.
结果显示,断裂韧度随加载速率降低和试验温度提高而增大,而切口深度对结果的影响不显著。
7 days of grouting the anchor bolt, and after the strength of solid anchor body reaches 70% of the designed strength, tensioning test of prestressed bolt will be conducted. Tensioning test load of anchor bolt is 110% of the maximum axial tension force, and tensioning test load will be gradually added. Load test of next level will not be conducted until the load under that current level gets steady. Grading and loading rate of tensioning load will comply with relevant regulations.
⑵ 锚杆灌浆7天后,待锚固体强度达到设计强度的70%,即可进行预应力张拉试验,锚杆张拉试验荷载为设计最大轴向拉力的110%,张拉试验逐级加载进行,只有当本级荷载达到稳定后,方可进行下一级加载试验,张拉加荷分级及加荷速率按规范进行。
Between the organization of transportation enterprises to exchange convection supply, reduce Kongshi, save energy, improve vehicle loading rate.
组织运输企业之间互相交换对流货源,减少空驶,节约能源,提高车辆实载率。