Download for Windows Premium
-65% Premium
Publiciteit
polynomial model

Vertaling van "polynomial model" in Chinees

We konden deze vermelding niet vinden. Er worden benaderende resultaten weergegeven. Controleer je spelling of stel voor deze term aan het woordenboek toe te voegen.
多项式模型
述多项式模型
英文关键词:acouso-physical properties wave velocity seafloor sediment polynomial model
中文关键词: 海底沉积物 纵波波速 物理性质 多项式模型
A method as claimed in claim 1 wherein said thermal model is a piecewise polynomial model.
根据权利要求1所述的方法,其特征在于,所述热模型为分段多项式模型。
Utilising data from a trial building with a conventional VAV system, five minute interval data for 16 days was fitted to the polynomial model using regression analysis to determine the various parameters. The coefficient of determination of the fit over this data set is r2=0.956, suggesting that the model provides a good fit. Additional second order terms were evaluated (i.e. power squared) but they did not significantly increase the explained variance and so this was not included in the model. An example of the resultant fit is shown in Fig. 9.
利用具有常规VAV系统的试验建筑的数据,采用回归分析将16天的五分钟间隔数据拟合成多项式模型,以确定各个参数。对该数据集进行拟合的确定系数为r2=0.956,这表示,所述模型提供了良好拟合。还对额外二阶项进行了估算(即,幂平方),但其没有较大增加已说明方差,因此没有包括在模型内。结果拟合的一个示例如图9所示。
Based on that, with time-sequence theory, it concluded the polynomial model is the basic model for predicting SISE.
在此基础上,研究、选择了时间序列理论预测轨道误差,得出了多项式模型是预测SISE的基本模型的结论。
The thermal model utilises a series of parameters, fitted to historical thermal data for the building. The thermal model can be a picccwisc polynomial model. The initial thermal model can be iteratively updated substantially daily. The daily operating plan is an optimisation of a combination of operator preferences that includes user comfort, power consumption and power costs. External inputs beyond operator preferences that drive the operating plan include electricity pricing data, weather forecasts and occupant comfort satisfaction daily HVAC operating plan can be recalculated substantially every 5 minutes. Optimising the alignment of HVAC operation with the current HVAC operating plan can be attempted substantially every 10 seconds.
所述热模型使用适用于建筑的历史热数据的一系列参数。所述热模型可为分段多项式模型。所述初始热模型可基本每天迭代更新。所述日常运行计划为操作者首选项(包括使用者舒适度、能耗和能源成本)的组合的优化。除操作者首选项之外的推进运行计划的外部输入包括电力定价数据、天气预报和居住者舒适满意度数据。所述日常HVAC运行计划可基本每5分钟重新计算一次。所述HVAC运行与当前HVAC运行计划之间的一致性的优化可基本每10秒钟进行一次。
loading historical power and corresponding temperature profiles 61, calculating expected resultant power and weather dependant factors 61, calculating constants for time and day of the week factors 63 and assembling a polynomial model that predicts building temperature at a given day of the week, time, expected external weather and HVAC power.
加载历史能耗和对应温度曲线61,计算预期能耗结果和取决于天气的因素61、计算时间和一周内日期因素63的常数,并且,组合多项式模型,所述多项式模型预测一周内指定日期、指定时间、预期外部天气和HVAC能耗下的建筑温度。
The polynomial model utilises HVAC power, ambient temperature and an identified thermal bascload profile for the building to estimate the average zone temperature for the building. This model is based on the form
所述多项式模型利用建筑的HVAC能耗、环境温度和识别的热基本负载曲线估算建筑的平均区域温度。该模型基于以下形式:
The Polynomial Polarization Model, which uses linear least-squares to determine the coefficients of the polynomial model.
查找表极化模型使用线性插值来确定两个连续极化数据样本之间的极化值。
Er zijn geen resultaten gevonden voor deze term.
Ga naar Premium voor toegang tot miljoenen vertaalvoorbeelden, onbeperkt woorden opslaan en leren, zonder advertenties.

Synoniemen voor polynomial model in het Engels

Woord & uitdrukking van de dag
Afbeelding van de dag
sheep: domesticated ruminant animal with a woolly coat
Ontdek het woord
Publiciteit

Resultaten: 8. Exact: 8. Verstreken tijd: 11 ms.