The pressure test report is enclosed, at the end of this manual.
This standard provides for the test and pressure test of the valve.
The vessel pressure test, meet the following conditions for qualified
容器耐压试验,符合下列情况为合格:
Insulating oil electrical equipment operation of frequent use, must be a pressure test every half a year
操作频繁的电气设备使用的绝缘油,必须每半年进行一次耐压试验;
If none of the above cases occurs, the pressure test is acceptable.
Pipe for potable water should be sterilized in full pipe of low chloride disinfectant after pressure test is passed.
饮用水管道在试压合格后宜采用低氯离子消毒液灌满管道进行消毒。
Gate, globe and angle valves shall also be subjected to a backseat pressure test.
闸阀、截止阀和角阀也应进行后座压力试验。
Mis-operation due to not understanding of pressure test procedures may lead to equipment damage, downhole accident or personal injury.
不了解试压程序误操作造成设备损坏、井下事故或人身伤害。
Installation, pressure test, utilization and management of well control devices
井控装置的安装、试压、使用和管理
Personal injuries caused because irrelevant personnel go into pressure test area
无关人员进入试压区域导致人身伤害
Conduct maintenance and pressure test for dedicated ducts to guarantee its air tightness
1、对专用的导管进行维护保养及试压保证其气密性;
Initial pressure test date and identification of the authorised body
首次压力试验日期和受权机构标志
Requirement for pressure test, purging and flushing design
压力试验及吹, 洗设计要求: