Vertaling van "autocreate configuration process" in Japans
We konden deze vermelding niet vinden. Er worden benaderende resultaten weergegeven. Controleer je spelling of stel voor deze term aan het woordenboek toe te voegen.
構成の自動作成処理
製品構成品目の自動作成処理
The following table shows how forecast consumption consumes the exploded forecast for 100 Laptop Computers after the AutoCreate Configuration process replaces sales order demand for the model, option classes, and options with sales order demand for the newly created configuration item.
Before you run the AutoCreate Configuration process, forecast consumption uses actual sales order demand for models, option classes, options, and derived sales order demand for selected mandatory components, to consume your forecasts.
The AutoCreate Configuration process replaces sales order demand for ordered models, option classes, and options with sales order demand for the newly created configuration item. This prompts forecast consumption to unconsume forecasts for the models, option classes, options, and selected mandatory components, and consume forecasts for the new configuration item and its components.
To ensure that forecast consumption is consistent before and after the AutoCreate Configuration process, forecast consumption only consumes forecasts for standard items on configuration bills where Forecast Control is set to Consume or Consume and Derive.
Forecast Consumption (a) and Forecast Consumption (b) represent forecast consumption before and after the AutoCreate Configuration process creates the configuration item and sing-lelevel bill for a represents component demand, NR represents net requirements, SO represents sales order demand, and FC represents forecast demand.
Note: If you set Forecast Control to None for an option, and then define forecasts for the option, you get inconsistent forecast consumption before and after the AutoCreate Configuration process. Before the AutoCreate Configuration process, forecast consumption uses actual sales order demand to consume any existing forecasts. After the AutoCreate Configuration process, forecast consumption does not consume those same forecasts since it only consumes forecasts for standard items on configuration bills where Forecast Control is set to Consume or Consume and Derive.
A model item can be a component of another model assembly. If you specify any supply type other than phantom for the lower level models, they will be treated as sub-assemblies during the AutoCreate Configuration process.
If a match for the top assembly is not found, the AutoCreate Configuration process will create a new configuration item for the top level assembly, and attempt to find matches at the sub-assembly levels. If a matching sub-assembly is found, it will use the existing configuration item's BOMs and routings. A new item is created for any unmatched configuration.
When creating the configuration item, the AutoCreate Configuration process also creates a single level bill of material for the configuration item. The single level bill includes all ordered options, all mandatory components of all ordered models and options classes, and each ordered model and option class. The models and option classes appear on the configuration bill as phantoms, and are only there to consume forecasts and relieve master schedules. They are not used by the planning process or Oracle Work in Process since all mandatory components from the model and option class bills are also included directly on the single level bill.
構成品目を作成すると、構成の自動作成処理により、その構成品目の単一レベルの部品構成表も作成されます。単一レベルの部品構成表には、受注済全オプション、受注済モデルとオプション区分の全必須構成部品、および各受注済モデルとオプション区分が含まれます。構成の部品構成表には、モデルおよびオプション区分が擬似品目として含まれており、これらは、需要予測を消し込み、基準計画をリリーフするためのみに存在します。また、モデルやオプション区分の部品構成表にある全必須構成部品は、単一レベルの部品構成表にも直接含まれるので、モデルとオプション区分は、計画処理またはOracle Work in Processでは使用されません。
Configure to Order items use cost type CTO for the rollup an item is created by the AutoCreate Configuration process, the cost of the configuration is based on the options selected. Single level rollup calculations for Make and Buy CTO configurations are calculated as follows
The following table illustrates the single level configuration bill created by the AutoCreate Configuration process in response to the sales order for 10 Laptop Computers with 486 processors, VGA1 monitors, and DOS operating system.
Forecast consumption takes place both before and after the AutoCreate Configuration process creates a configuration item, bill, and routing for a configuration. Oracle Master Scheduling/MRP and Supply Chain Planning ensures that forecast consumption is consistent before and after the creation of the configuration item.
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.