We konden deze vermelding niet vinden. Er worden benaderende resultaten weergegeven. Controleer je spelling of stel voor deze term aan het woordenboek toe te voegen.
クリティカル・パス
Potential problems, resource constraints, and critical-path bottlenecks can be identified so that the process can be improved during process design.
Often denoted by T∞ in the literature, and sometimes called critical-path length. spawn To call a function without waiting for it to return, as in a normal call.
CPU "Central Processing Unit"; a synonym for "core", or a single processor of a multicore chip. critical section The code executed by a strand while holding a lock. critical-path length See span. data race A race condition that occurs when two or more parallel strands, holding no lock in common, access the same memory location and at least one of the strands performs a write.
Performing the work during normal operations allowed the plant to upgrade to a superior maintenance coating system while lowering total cost and reducing critical-path work on shutdowns.
"Mask blank inspection is a critical-path technology issue in the development of EUVL," stated Kurt R. Kimmel, Mask Strategy program manager for ISMT.
ISMTのマスク戦略プログラムのマネージャであるKurt Kimmel氏は次のように述べています。
Potentieel gevoelige of ongepaste informatie
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.