For scheduling and lead time calculations, extended resource usages are rounded to the next minute. In the following example, each resource usage is 72 seconds. The scheduling logic and lead time calculation round to the next minute - therefore each resource usage is rounded to 120 seconds, and the total duration is 240 seconds.
Note: Alternate resources are not considered in lead time calculation.
注意: 代替生産資源は、リード・タイム計算時は考慮されません。
Recommendation: if you are using Lead Time scheduling, you will want updating the Ship Method to trigger rescheduling, because Ship Method is a factor for lead time calculation.
When a group of multiple resources are defined as simultaneous resources, the scheduler uses the one resource having the longest duration to calculate start and end dates for the group. See: Resource Factors in Lead Time Calculation
Make: Cumulative manufacturing lead-time. Either automatically calculate it or enter it. To automatically calculate it use either the Oracle Bills of Material Compute Lead Time calculation or the Lead Time Rollup concurrent processes.
製造: 累積製造リード・タイム。自動的に計算するか、入力します。自動的に計算するには、Oracle Bills of Materialのリード・タイム計算の計算、またはリード・タイム積上コンカレント・プロセスを使用します。
Lead-time Item Attributes and Lead Time Calculation Concurrent Processes
リード・タイム品目属性とリード・タイム計算コンカレント・プロセス
You can limit the items included in the manufacturing lead time calculation by specifying an item range or item category range when you submit the manufacturing lead time program. Using item categories, you can segregate the manufactured items whose lead times you manually maintain from those items you include in the manufacturing lead time can also limit the parent items included in the cumulative lead time calculations by using item categories.
Material and resource requirement lead times are calculated using the Calculate Manufacturing Lead Time concurrent program. This program determines the lead time for items and assemblies using information from the bill of material and routing setup. This includes lot size, item lead time attributes (such as processing and cumulative lead times), and fixed and variable components. The lead time calculation rollup program also includes resource usage features that can affect processing lead time.
Oracle Inventory lets you check component available to promise (ATP) for assemble to order (ATO) and Pick to Order (PTO) items. Oracle Bills of Material allows you to specify the components of an ATO or PTO product that must be promised using ATP. When you check ATP for a product having such components, Inventory determines the requirement date for components by first computing the manufacturing lead time for that product using the dynamic lead time calculation and then finding the date that is the number of workdays before the requested ship date. Inventory assumes that all ATO product components are required at the beginning of the ATO job.
Oracle Inventoryでは、受注組立(ATO)品目と受注ピック(PTO)品目について、構成部品の有効在庫数量(ATP)をチェックできます。Oracle Bills of Materialでは、ATPを使用して納期を決めなければならないATOまたはPTO製品の構成部品を指定できます。このような構成部品が含まれる製品のATPをチェックすると、Oracle Inventoryでは、最初に動的リード・タイム計算を使用してその製品の製造リード・タイムが計算され、次に要求納入日前の稼働日数を示す日付が検索されて、構成部品の所要日が決定されます。ATO製品のすべての構成部品は、ATO製造オーダーの開始時に必要であるとみなされます。
For scheduling calculations, extended resource usages are rounded to the next minute. See: Resource Factors in Lead Time Calculation
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.