In the Scheduling tabbed region, for each alternate resource, enter a Replacement Group value.
計画タブ・リージョンでは、各代替生産資源について置換グループ値を入力します。
Navigate to the Scheduling tabbed region. For each alternate resource, enter a Replacement Group value.
計画タブ・リージョンにナビゲートし、代替生産資源ごとに置換グループ値を入力します。
For example, all resources that belong to alternate resource group 1, are assigned an replacement group value of 1. All resources that belong to alternate resource group 2, are assigned a replacement group value of 2.
This value is used in grouping several resources together as an alternate resource group. The primary resource is always a Replacement Group value of 0.
On the Operation Alternate Resources form, Scheduling tab, alternate resource replacement groups are defined where M2 and C2 have a replacement group value of 1, and M1 and C2 have a replacement group value of 2.
In constraint-based scheduling - you can specify that a group, or set of resources, is substituted for another set. This enables resources to be sequential and span multiple schedule sequences. This functionality is used in manufacturing environments where groups of machines are used consecutively in an type of machine used in the first group determines the type of machine used in the second group. The groups are not simultaneous, therefore each corresponding pair of machines is assigned a replacement group value within a substitute group. Alternate resource sets are defined using the Resource Sequence, Schedule Sequence, Substitute Group, and Replacement Group fields
This value indicates which resources can be used as alternates. Resources with the same substitute group number can replace other resources defined with that substitute group number, and the same replacement group number value.
In the Replacement Group field, assign the same value to the alternate resource groups.
置換グループフィールドで、同じ値を代替生産資源グループに割り当てます。
The replacement group for the primary resource is 0, for the alternate it is another value.
主要生産資源の置換グループは0(ゼロ)で、代替生産資源の場合は別の値です。
The schedule sequence number indicates the period the resource is used. When defining resource sets, you can define records with different schedule sequences using the same substitute group number value. This enables each replacement group, within a substitute group, to have a different set of schedule sequences.
The schedule sequence number indicates the sequence the resource is to be used - this value defaults from the Resource Requirements window. The replacement group can contain different sequences even if the primary replacement group has only one schedule sequence.
Replacement Group number establishes relative priority. Enter a value of 1 or higher. If you have multiple alternates, enter them as multiple rows with appropriate Replacement Group numbers to indicate priorities.
The mode of thought common in this group values tradition highly.
この集団に共通するものの考え方は、伝統を非常に重んじるという点にある。
Potentieel gevoelige of ongepaste informatie
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.