Vertaling van "resource sequence number" in Japans
We konden deze vermelding niet vinden. Er worden benaderende resultaten weergegeven. Controleer je spelling of stel voor deze term aan het woordenboek toe te voegen.
生産資源連番
生産資源順序番号
Substitute groups are used in the order of their defined schedule sequence number and resource sequence number combination.
代替グループは、定義済の計画連番と生産資源連番の組合せ順に使用されます。
You can specify multiple resource sequences with the same replacement group number. this indicates that a set of primary resources are replaced by a set of alternate resources with the resource sequence number, and schedule sequence number, within each replacement group, indicating the order or simultaneity of scheduling within that replacement group.
You can assign multiple resources per operation to schedule labor, machine, and other activities you perform within an operation. Detailed scheduling schedules multiple resources sequentially based on their resource sequence number.
In Table 1 - 16, operation sequence 30 has two resources: Plating and Plating preparation. Detailed scheduling schedules these resources sequentially based on their resource sequence number.
Firm Supply Resource Sequence number: If resource firming leads to the exception message.
確定供給生産資源連番: 生産資源確定が例外メッセージの原因の場合。
Main: UOM, Operation Sequence number, Department, Resource Sequence number, Basis, Usage Rate or Amount Value/Inverse Value
メイン: 単位、工程連番、部門、生産資源連番、基準、単位当り必要資源量、またはその逆数
You can assign multiple resources to routing can sequence these resources as required. If you assign multiple resources, they are scheduled sequentially based on their resource sequence number, or in parallel, based on their scheduled attribute
Disable: Disable the resource from the operation. Designate an existing resource sequence number.
失効: 工程から生産資源を無効にします。既存の生産資源順序番号を指定してください。
Sequence Resource sequence number
順序生産資源の順序番号
In the Main tabbed region of the Resource Requirements window, select or enter the resource Sequence number.
生産資源所要量ウィンドウのメインタブ・リージョンで、生産資源の連番を選択または入力します。
Enter the Resource Sequence Number. If you selected the Add action, enter a new resource sequence number. If you selected the Disable action, enter an existing resource sequence number.
Res Seq Actual or planned operation resource sequence number for the requirement
生産資源連番生産資源に対する所要を満たす実績または計画上の生産資源連番。
Potentieel gevoelige of ongepaste informatie
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.