Examples with "the atp post plan processing" and their translation in Japans
We konden deze vermelding niet vinden. Er worden benaderende resultaten weergegeven. Controleer je spelling of stel voor deze term aan het woordenboek toe te voegen.
After the plan run, the ATP post plan processing is automatically launched.
計画を実行すると、ATP計画後処理が自動的に起動します。
Note: If you run the plan with the ATP flag deselected and then select the ATP flag, you need to run the ATP Post Plan Processing concurrent program manually.
Run ATP Post Plan Processing concurrent program. 200 The ATP Post Plan Processing concurrent program has not been run for the ATP-capable plan. Run the ATP Post Plan Processing concurrent program. If you are not using demand priority based Allocated ATP or Summary Based ATP, make sure the related profile is set correctly.
Summary Concurrent program is running. Try ATP later. 160 The ATP Post Plan Processing concurrent program is still running. Wait until the ATP Post Plan Processing concurrent program is finished running.
Re-launch the ATP post plan processing after you analyze or resolve the issue reported in log file. The ATP continual synchronization process automatically continues after the post plan processing steps are complete.
You need to re-launch the ATP post plan processing after analyzing/resolving the issue reported in log file. The ATP 24x7 synchronization process will automatically continue after the post plan processing steps are complete.
Once the ATP Post Plan Processing concurrent program successfully finishes, you can view the allocation result in View Allocation Workbench. In this workbench, the left-hand side is the tree structure representing your demand classes. You can choose a node and view the horizontal plan. The horizontal plan gives a picture over time of the total demand, total supply, net ATP, and cumulative ATP for the total and for the particular node that you chose.
the original plan is still available for ATP inquiry. The refreshed plan is ready from the planning perspective, that is, it is (visible in the Planners Workbench. However, the ATP post plan processing is not complete.
After the plan runs, ATP post-plan processing launches automatically.
計画の実行後、ATP計画後処理が自動的に起動します。
Optionally, run the concurrent program ATP Post Plan Processing.
オプションで、コンカレント・プログラムATP計画後処理を実行します。
From the list of values in the Names field, select ATP Post Plan Processing.
名称フィールドの値リストからATP計画後処理を選択します。
If you need to re-run the full summarization process, you need to run ATP Post Plan Processing again.
完全要約処理を再実行する必要がある場合は、ATP計画後処理を再実行する必要があります。
When you launch a plan that has the ATP flag selected, the plan run process automatically launches ATP Post Plan Processing at the end of the plan run. This concurrent program analyzes the plan output and summarizes the supply according to the item's allocation rule. When this program finishes successfully, you will have a valid availability picture for order promising.
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.