Now you want to compare the assignment-timephased Baseline2 Budget Cost field with the current Budget Cost field.
Ahora desea comparar el campo Trabajo presupuestado de línea base2 con el campo Trabajo presupuestado actual.
EU leaders have committed to reach the objective of 20% primary energy savings in 2020 compared to a baseline2.
Los dirigentes de la UE se han comprometido a alcanzar el objetivo del 20 % de ahorro de energía primaria en 2020 con respecto a la situación de partida2.
The baseline cost field that is used (Baseline1 Cost, Baseline2 Cost, and so on) depends on which baseline was saved (for example, Baseline 1, Baseline 2, and so on).
The baseline cost field that is used (Baseline1 Cost, Baseline2 Cost, and so on) depends on which baseline was saved (Baseline 1, Baseline 2, and so on).
Likewise, the Baseline2 Cost through Baseline10 Cost fields store planned task, resource, or assignment costs for Baselines 2 through 10.
Del mismo modo, los campos Costo de línea base2 a Costo de línea base10 almacenan la tarea, el recurso o los costos de asignación planeados para las líneas de base de 2 a 10.
The baseline work field that is used (Baseline1 Work, Baseline2 Work, and so on) depends on which baseline was saved (Baseline 1, Baseline 2, and so on).
Similarly, the Baseline2 Budget Work through Baseline10 Budget Work fields store planned budget work for Baselines 2 through Baseline 10.
Del mismo modo, los campos Costo de línea base2 a Costo de línea base10 almacenan la tarea, el recurso o los costos de asignación planeados para las líneas de base de 2 a 10.
In the Task Usage view, you show both the Baseline2 Budget Cost column and the Budget Cost column in the sheet portion of the view.
In the Resource Usage view, you show the project summary task, and then add both the Baseline2 Budget Cost field and the Budget Cost field.
Andere resultaten
Cannot baseline. The project is already baselined.
This schedule is baselined. Do you want to remove the baseline?
A phase of SDLC is assumed over if it baselined, i.e. baseline is a measurement that defines completeness of a phase.
Una fase de SDLC se asume sobre si la línea base, es decir, la línea de base es una medida que define la integridad de una fase.
Baseline (mean) Change from baselinec