The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
根据本合同签发的停工令中,承包商不享有公平调整合同价款或延长履行进度的权利。
Shall coordinate and handle with quality issues, approve shutdown advice proposed by Quality Management Department and release stop work order.
负责协调解决质量问题,批准质量管理部提出的停工建议并发布停工令;
The constructors must follow the Stop Work Order given either by three-level QC personnel from the project headquarter or by the Owner and Engineer's representatives.
(3) 无论是对项目部三级质检部门人员还是业主和监理工程师代表发出的停工令,施工人员均必须执行。
They're repealing the stop work order on my house!
他们撤消了对我特别屋的禁令
And that's when we got a stop work order.
那时我们收到了停工命令
They put a stop work order on the mural and other window work before it was completed because, according to the Borough, it violated Borough Ordinance 40-3002 which deals with temporary window signs.
Insider Trading Policy - Statement vs publishing policy Workforce Health - need to evaluate further Employee Protection Policies - covers workforce non-retaliation and compliant process - possibly areas of Human Rights Harassment Policy Link EEO Statement and Policy - will need to make global such as editing for diversity, language Stop Work Order Policy link Workforce Training and Development - need to establish a policy and/or narrative of all current actions with this topic
The project shall be effectively monitored according to the degree of importance and the characteristics of the project as well as the characteristics of concealed works through walkaround inspection, stand-by supervision, inspection of measurement tests and instruction documents. Along with progress of construction works, the process quality and construction quality shall be inspected & accepted according to standards, regulations, specifications, design drawings, and equipment documents specified in the contract as well as approved construction plans, so as to make all quality activities in the process of construction under controlled state; For constituent works and concealed works not complying with quality standard and technical requirement of the drawing, orders can be issued to require rectification or re-worked. If necessary, Stop Work Order can be issued as well.
12.1.2 terminate the Work covered by such Stop Work Order in which instance the Buyer shall pay to the Seller the sums set out in Condition 12.3. 12.2 If a Stop Work Order is cancelled or the period of the Stop Work Order or any extension thereof expires, the Seller shall resume work. If the Stop Work Order results in an increase in the time required for, and/or the cost of, performance of the Contract, and if the Seller asserts a claim for such increase within ninety (90) calendar days after the end of the period of work stoppage then subject to the Seller's obligation to minimise its costs under these circumstances (in accordance with Condition 12.1), the Buyer shall reimburse the Seller for the direct costs incurred by the Seller as a result of the Stop Work Order.
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.