We konden deze vermelding niet vinden. Er worden benaderende resultaten weergegeven. Controleer je spelling of stel voor deze term aan het woordenboek toe te voegen.
The calculation unit calculates the operation schedule for a second power generation unit that generates the power derived from non-renewable energy on the basis of the predicted value of the demand and the predicted value of the power generation volume.
When the plurality of power generators is driven simultaneously, the external output terminal (d1) of the first power generation controller and the external sensing terminal (c2) of the second power generation controller are connected.
This structure is obtained by forming the adhesive layer (3) on the first power generation layer (1) which is formed from an organic compound solution containing a donor material and an acceptor material, and then applying an organic compound solution containing a donor material and an acceptor material over the adhesive layer (3) for forming the second power generation layer (2).
Disclosed is a fuel cell system which is provided with: a first power generation module, which has a power generation section that includes a catalyst, an anode-side non power generation section in contact with the power generation section, and a cathode-side non power generation section that is disposed on the side opposite to the anode-side non power generation section with the power generation section therebetween; at least one second power generation module adjacent to the first power generation module; a current adjusting circuit connected parallel to each of the power generation modules; and a current control section wherein a current adjusting section connected parallel to the first power generation module increases a current flowing in the first direction from the anode-side non power generation section to the cathode side non power generation section in the case where a cell voltage, i.e., a voltage between the anode-side non power generation section and the cathode-side non power generation section, is equivalent to or lower than a first predetermined voltage that is a negative voltage.
Consequently, according to the state of the odd-numbered-gear clutch (Co) and the even-numbered-gear clutch (Ce), it is possible to generate power in the first or second power generation mode by engaging one of the clutches, and as a result, to supply power without interruption.
The Kleen Power Plant is Sojitz's second power generation project in the U.S. following last year's investment in the Birdsboro Power Plant in Pennsylvania.
When the power supply value of the first power generation source is less than a standard power value, which is the power value that should be output by the distributed power source unit, the power storage means and the second power generation source supply the shortage in the power value.
This hybrid vehicle is capable, in the neutral range or parking range, of generating power in a first power generation mode when engaging the clutch (Co) in an odd-numbered gear and transmitting drive power from an engine (E) to a motor generator (MG) via a first input shaft (12), and of generating power in a second power generation mode when engaging the clutch (Ce) in an even-numbered gear and transmitting drive power from the engine (E) to the motor generator via an inversion means (45) and the first input shaft (12).
Er worden alleen voorbeelden gegeven om u te helpen het woord of de woordcombinatie waarop u hebt gezocht, te vertalen. Deze worden niet door ons geselecteerd of gevalideerd en kunnen ongepaste taal bevatten. Wij vragen u melding te maken van voorbeelden die dienen te worden aangepast of verwijderd. Vertalingen met grof of informeel taalgebruik worden meestal rood of oranje gemarkeerd.