Télécharger pour Windows Premium
Offre spéciale pour découvrir Premium
-65% à vie sur tous nos abonnements
Publicité
critical path method
统筹方法
关键路径方法
关键路径法
重要途径方法
Create PERT charts for project or task management, schedules, timetables, agendas, work breakdown structures, critical path method, project lifecycles, goal setting, and timelines.
创建用于项目或任务管理的 PERT 图表、日程、时间表、议程、任务分解结构、统筹方法、项目周期、目标设定和时间线。
Use for project management, task management, schedules, timetables, agendas, work breakdown structures (WBS), critical path method (CPM), project lifecycles, goal setting, and timelines.
用于项目管理、任务管理、日程安排、时间表、议程、任务分解结构 (WBS)、统筹方法 (CPM)、项目周期、目标设定和日程表。
Edraw Max is a vector-based diagramming software with rich examples and has the tools to make it easy to Create PERT charts for project or task management, timetables, work breakdown structures, critical path method, project lifecycles, goal setting, schedules and agendas.
亿图图示专家是一个矢量绘图软件,内置有丰富的例子和模板,所带工具使绘制以下图表轻松快捷:给项目或任务管理创建的时间表,工作分解结构,关键路径方法,项目周期,目标设定,待办事项和日程等。
The team helped contractors prepare the quality work plans, safe work plans, submissions, operation and maintenance (O&M) manuals, critical path method (CPM) scheduling, and payment schedule.
该团队帮助合约商准备高质素的工作计划,安全工作计划,提交,操作和维修(O&M) 手册,重要途径方法(CPM)的时间安排,以及付款的时间表。
TYLI reviewed the contractors' baseline schedule and updated the monthly critical path method (CPM) schedule.
林同棪国际评审了承建商的基线时间表并更新每月重要途径方法(CPM)时间表。
Helps you easily create PERT charts and timeline for project or task management, timetables, work breakdown structures, critical path method, project lifecycles, goal setting, schedules and agendas. UML Diagram Software
帮助您创建PERT和时间轴用于工程或者任务管理,时间表,工作细则结构图、关键路径方法、工程周期、目标设定、计划和安排等。 UML图软件
In order to effectively track project progress, PMCo will operate critical path method (CPM) project scheduling software.
为了有效跟踪项目进度,PMCo 将运行关键路径法 (CPM) 项目进度安排软件。
One thrust of critique has come from the critical chain developers and followers (e.g. Eliyahu M. Goldratt and Lawrence P. Leach), as opposed to critical path method adherents.
這些評論主要來自關鍵鏈開發者和追隨者(如Eliyahu M. Goldratt和Lawrence P. Leach),而非關鍵路徑方法追隨者。
Critical Path Method (CPM) explaining the time schedule need to be attached.
用关键路径方法(CPM)对附带的时间进度进行说明。
The basic methods of management ard control of construction projects are the Program Evaluation and Review Technique (PERT) and the Critical Path Method (CPM).
这种用网络来控制和管理工程施工的基本方法有计划评审技术(PERT)和关键路线法(CPM)。
Network graphing, the Critical Path Method, Network optimization, the Program Evaluation and Review Technique.
网络图及其绘制原则、时间参数计算及关键路线确定、网络优化分析、计划评审技术。
However, PERT is a misnomer, and the so-called PERT method discussed in most of the literature on timing analysis refers to the critical path method (CPM) that is widely used in project management.
事实上,PERT这个称呼是一种错误用法,在许多有关静态时序分析的文献中,所谓的PERT方法是指关键路径法,它在许多项目管理中被应用。
Based on Critical Path Method (CPM), the trade-off among time, cost and quality of a process was achieved by appropriate distribution of resources among the activities of the process.
利用关键路径法,通过在多个活动中合理分配资源来使整个过程的时间、成本和质量达到折衷。
Aucun résultat pour cette recherche.
Passez à Premium pour accéder à des millions d’exemples de traduction, enregistrer et apprendre du vocabulaire en illimité, le tout sans publicité.

Synonymes et analogies de "critical path method" en anglais

Le mot et l’expression du jour
L’image du jour
slipper: flip-flop type of sandal
Découvrir le mot
Publicité

Résultats: 13. Exacts: 13. Temps écoulé: 14 ms.