Unless the SCC provide otherwise, the frequency shall be one interim payment per month.
除非《合同专用条款》另有规定,期中付款频次应为每月一次。
the demolition and proper re-execution, or satisfactory repair, notwithstanding any previous test thereof or interim payment therefore, of any work which, in respect of components, materials, workmanship or design by the Contractor for which he is responsible, is not, in the opinion of the Engineer, in accordance with the Contract.
将与"工程师"认为不符合本合同要求的由"承包人"负责的部件、材料、工艺和设计相关的任何工程拆除、重新施工或依照"工程师"的要求进行修理,即使已该工程进行事先试验或已对其进行期中付款也不例外。
Until such time as each current cost index is available, the Engineer shall determine a provisional index for the issue of Interim Payment a current cost index is available, the adjustment shall be recalculated accordingly.
在获得所有现行费用指数之前,工程师应确定一个期中支付证书的临时指数。当得到现行费用指数之后,相应地重新计算并作出调整。
A commercial interim payment is given to the contractor after some work has been done, whereas a commercial advance payment is given to the contractor when no work has been done.
某些工作完成后给予承包人商业中期付款,未完成任何工作时给予承包人商业预付款。
"(2) Where any such rules make provision in accordance with subsection (1), the rules may include provision for enabling a party to any proceedings who, in pursuance of such an order, has made an interim payment to recover the whole or part of the amount of the payment in such circumstances, and from such other party to the proceedings, as may be determined in accordance with the rules."
(2) 凡任何该等规则按照第(1)款作出规定,该等规则可包括一项规定,使已依据上述命令作出中期付款的任何法律程序的一方,能在按照该等规则决定的情况下,向按照该等规则决定的该等法律程序的另一方,追讨中期付款的全部或部分款项。
"(a)""interim payment"" (中期付款), in relation to a party to any proceedings, means a payment on account of any damages, debt or other sum (excluding any costs) which that party may be held liable to pay to or for the benefit of another party to the proceedings if a final judgment or order of the Court in the proceedings is given or made in favour of that other party; and"
(a) "中期付款"(interim payment) 就任何法律程序的某一方而言,指因该一方可能被判须负法律责任向该等法律程序的另一方支付或为使该另一方得益而支付的任何损害赔偿、债项或其他款项(讼费除外)而作的付款(如在该等法律程序中,法庭作出的最终判决或命令是判该另一方胜诉);及
"(1) The power to make rules of court under section 54 shall include power to make provision for enabling the High Court in such circumstances as may be specified to make an order requiring a party to pending proceedings to make an interim payment of such amount as may be specified in the order, either by payment into court or (if the order so provides) by paying it to another party to the proceedings. (Amended 25 of 1998 s. 2)"
(1) 根据第54条订立法院规则的权力,包括作出以下规定的权力,即为使高等法院能在指明的情况下作出命令,规定待决的法律程序的一方作出一笔中期付款,款额由命令指明,付款方法是将款项缴存法院或(如命令有此规定)付给该等法律程序的另一方。 (由1998年第25号第2条修订)
The removal and proper re-execution (notwithstanding any previous test thereof or interim payment therefore) of any work which, in respect of materials or workmanship, is not, in the opinion of the Owner, in accordance with the Contract.
根据业主意见,对不符合合同规定材料或工艺的任何相关工作进行撤销与适当翻工(尽管已经过测试或中期付款)。
"(1) Where a payment or an interim payment is made to a contractor or for his benefit in respect of any construction works, the contractor shall, within 14 days after the payment is made or such further time as the Authority may in any case allow, give notice of it to the Authority in such form as the Authority may specify. (Amended 60 of 1982 s. 4)"
(1) 凡就任何建造工程而向承建商或为承建商的利益而作出付款或中期付款,该承建商须在付款后14天内或训练局就任何个案所容许的较长期限内,采用训练局指明格式,将此事通知训练局。 (由1982年第60号第4条修订)
Where an application has been made to the Copyright Tribunal under section 162 or 163, the Tribunal may of its own motion or on the application of the licensing body order the licensee to make such interim payment of such royalty as the Tribunal thinks just to the licensing body.
(1) 凡已有申请根据第162或163条向版权审裁处提出,审裁处可自行或应特许机构的申请,命令特许持有人就该审裁处认为属公正的使用费向该特许机构作出中期付款。
If the Contractor is entitled, under the Contract, to an interim payment for Plant and Materials which are not yet on the Site, the Contractor shall nevertheless not be entitled to such payment unless
如果根据合同规定, 承包商有权获得尚未运到现场的生产设备和材料的期中付款, 承包商必须具备下列条件才有权得到:
2.2 Certain elements of the Design Data shall be identified as submissions, which shall become Milestones for Interim Payment purposes.
2. 2设计数据的某些元素应被视为提交资料,作为中期付款的里程碑。
The first defendant asserted to be a sub-contractor of the plaintiff and to have submitted applications for interim payment in respect of certain transactions.
第一被告声称是原告的分包商,并曾对某些交易提出过临时支付的申请。